"With respect to the region in question, there is one notification on the construction of a new nuclear power plant and one commitment on closure. On 27 February of this year (National Electric Company) notified the Commission, under Article 41 of Euratom, of its investment project. The notification concerns the construction of a new third-generation VVER-1000 nuclear plant in Belene (Bulgaria). The closure of units three and four of Kozlodui nuclear power plant, as an integral part of Bulgaria’s Treaty of Accession to the European Union, is also happening. The Commission, in its role as Guardian of the Treaties, will oversee the correct implementation of the relevant clauses of this Treaty. The closure of these units should not cause major energy supply concerns. The Community assistance for decommissioning, based on the Treaty of Accession, also covers measures consequential to the closure of the reactors in the field of replacement capacity, energy efficiency and supply actions. In addition, in the opinion of both the Commission and the World Bank, new base load investments are needed throughout the whole region. However, there are no particular structural problems in generation at present. The Commission has consistently underlined that it is for each Member State to decide whether or not to rely on nuclear power for the generation of electricity. Should Member States decide to invest in new nuclear power generation, the Commission will exercise available powers to ensure that new investment projects meet the highest standards of safety, security and non-proliferation, as required by the Euratom Treaty. On the seismic issue, pursuant to Article 37 of Euratom, Bulgaria is required to provide the Commission with general data relating to the plan for the disposal of radioactive waste. This will apply to the new nuclear power plant in Belene. The submission of this data is due at least six months before any discharge authorisation of radioactive effluents is granted by the Bulgarian competent authorities. On the basis of this data, and after consultation of the Article 31 Group of Experts, the Commission will deliver an opinion. The latter will check whether the implementation of the plan, both in normal operation and in the event of accident, is liable to result in a radioactive contamination of the water, soil or air space of another Member State. As the Commission review also covers accidental scenarios, the general data to be provided by Member States should contain information on the degree of seismic activity in the region, on probable maximum seismic activity and on the designed seismic resistance of the nuclear installation."@en1
lpv:unclassifiedMetadata
"Natsionalna Elektricheska Kompania"1

Named graphs describing this resource:

1http://purl.org/linkedpolitics/rdf/English.ttl.gz
2http://purl.org/linkedpolitics/rdf/Events_and_structure.ttl.gz

The resource appears as object in 2 triples

Context graph